a wide & varied portfolio of rope access work

At Rope Task we have carried out a wide and varied portfolio of work.

Please follow the links below to see the work undertaken or check out the latest jobs that we have completed.


<< CASE STUDIES

a wide & varied portfolio of rope access work

At Rope Task we have carried out a wide and varied portfolio of work.

Please follow the links below to see the work undertaken or check out the latest jobs that we have completed.


<< CASE STUDIES

134 Edmund Street, Birmingham

Client
Miller Construction

Problem
134 Edmund Street is a 10 storey office building with an 8 storey internal glass atrium in the centre of the structure. Scaffolding had been removed from within the internal atrium and this resulted in safe access problems, as a number of tasks needed completing.

Solution
Rope Task technicians carried out the following tasks using rope access techniques, without the use of conventional scaffold access:

Removal and replacement of cracked glazing sheets weighing over 100kg, without the use of mechanical lifting machinery. As the space within the atrium was limited, technicians used rigging, pulley and lifting skills combined with rope access equipment, to remove and lower glazing sheets and then haul and replace new glazing, all at an height of 35 metres.

Replacement of cladding sheets to atrium walls

Mastic pointing between cladding and glazing

High level clean downs using rope access

Window cleaning using rope access

Installation of cladding panels, in confined space, using rope access

Installation of fixed safety ladders and fall arrest safety lines, to rooftop.

 

f8464705160e8ae540ba2e43c3c39437_f96.jpg

Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our blog storm doris clean up

After the strong winds brought on by Storm Doris last week Rope Task have been busy working at height to safely remove loose materials that have been left over from the storm. Accessing high rise buildings and structures presents its own unique problems, add to this loose materials hanging from buildings and you have the high risk of endangering workers ...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg