Rope Task undertake independent condition surveys of cladding systems on all types of commercial, industrial, public and residential buildings.
Testing the pull out strength of industrial and safety critical fixings is an essential and legal part of health and safety in the construction industry.
After the strong winds brought on by Storm Doris last week Rope Task have been busy working at height to safely remove loose materials
Speller Metcalfe Construction gave us the task of high level cleaning to the new Perdiswell Leisure Centre Worcester. As the construction works were nearing completion, all high level steelwork needed to be dusted down and cleaned...
How do you remove an architectural feature suspended 25 meters off the ground between three high rise apartment blocks in the centre of Manchester?
Serious complications can result in loose cladding on high rise buildings. Rope Task were tasked with the difficult job of securing a number of loose cladding panels on a city centre 19 floor apartment block.
New LED lighting was needed inside of a large car paint spraying unit in Solihull Birmingham. The only problem was that access was very limited....
Window cleaning is a hazardous maintenance task carried out on most premises. On buildings where access is regularly required using a harness, consideration should be given to using safety eyebolts to attach the harness line to.
Kee Walk® provides a safe, anti-slip, level walkway for anyone who needs to access a roof in the course of their work. It provides a clear demarcation route which protects the roof surface from unnecessary damage and uniformly distributes the pedestrian load across its surface.
KEEGUARD Ladder Kit provides permanently fixed guardrail either side of an existing fixed ladder and a self-closing swing gate permitting safe roof access for the purpose of inspection or maintenance work on roofs...